Bugs Pay for Days of Steady Reservoir Releases to Reduce Costs to Hydropower Customers and Sustain Funds to Maintain Infrastructure
Authors: |
|
|
---|---|---|
Owners: |
|
This resource does not have an owner who is an active HydroShare user. Contact CUAHSI (help@cuahsi.org) for information on this resource. |
Type: | Resource | |
Storage: | The size of this resource is 7.8 MB | |
Created: | Apr 13, 2023 at 6:18 p.m. | |
Last updated: | Apr 18, 2023 at 12:56 p.m. (Metadata update) | |
Published date: | Apr 18, 2023 at 12:56 p.m. | |
DOI: | 10.4211/hs.b5c65e50679f48dfaf0d5e86dafd9815 | |
Citation: | See how to cite this resource |
Sharing Status: | Published |
---|---|
Views: | 878 |
Downloads: | 11 |
+1 Votes: | Be the first one to this. |
Comments: | No comments (yet) |
Abstract
Steady low reservoir releases allow downstream aquatic invertebrates (bugs) to lay and hatch eggs and increase production. These releases also reduce revenue from hydropeaking operations, increase costs to hydropower customers, reduce funds to maintain project infrastructure, repay project loans, and exacerbate hydropower production-ecosystem conflicts. This paper has the purpose to (1) quantify tradeoffs between the number of days of bug flows and hydropower revenue, (2) identify ways to reduce costs to hydropower customers, and (3) inform the design of a financial instrument to increase bug production, compensate hydropower customers for costs, and reduce conflict. A linear program identified tradeoffs between hydropower revenue and number of days of steady low releases per month for different contract and market energy prices and monthly release volumes across March to October months when bugs are most productive. We found that bug flows on 8 weekend days per summer month in 2018 from Glen Canyon Dam, Arizona reduced hydropower revenue by $300,000 (June) to $600,000 (August). Shifting bug flow days to Spring/Fall months reduced costs. To reduce conflict, we suggest to create a new financial instrument funded by the Federal Treasury for ~$300,000 to $600,000 per month. The instrument can give ecosystem managers more flexibility to choose days for steady low releases that advantage bugs and pay hydropower producers for costs. Next steps are to engage Federal agencies on benefits and limitations of the proposed instrument and expand to steady high releases that mobilize sediment, build sandbars, and disadvantage non-native, invasive fish populations.
This resource contains the following items:
+ README.md - Markdown file with documentation for this resource including directions to reproduce results in the manuscript
+ GCD_BugFlowExperiment-main - Folder with sub-folders that contain the data, models, and code to reproduce figures, tables, and results in the manuscript
+ RindRosenberg-BugsPayForDaysOfSteadyReservoirReleases.docx -- Word document with manuscript for work.
+ Rosenberg-BugsPayForSteadyFlows-AprilAMP.pptx - Power point presentation with overview of work presented at April 12/13, 2023 meeting of the Technical Work Group (TWG) of Glen Canyon Dam Adaptive Management Program (GCD-AMP).
+ KeyFeedbackFromTechnicalWorkGroup-April12-2023.docx - Key feedback from presentation to GCD-AMP Technical Work Group on April 12, 2023.
Subject Keywords
Coverage
Spatial
Temporal
Start Date: | |
---|---|
End Date: |
Content
README.md
Bugs Pay for Days of Steady Reservoir Releases to Reduce Costs to Hydropower Customers and Sustain Funds to Maintain Infrastructure
This study is part of my M.S. degree in Civil and Environmental Engineering at Utah State University, Utah, USA
The research is part of Future of the Colorado River Project and partially funded by Higher Education Commission (HEC), Pakistan
Corresponding Author: Moazzam Ali Rind (moazzamalirind@gmail.com)
Advised by: Dr. David E. Rosenberg (http://rosenberg.usu.edu/)
Starting Date: 6/1/2019
Lasted updated: 5/19/2022
Project Summary
Steady low reservoir releases allow downstream aquatic invertebrates (bugs) to lay and hatch eggs and increase production. These releases also reduce revenue from hydropeaking operations, increase costs to hydropower customers, reduce funds to maintain project infrastructure, repay project loans, and exacerbate hydropower production-ecosystem conflicts. This paper has the purpose to (1) quantify tradeoffs between the number of days of bug flows and hydropower revenue, (2) identify ways to reduce costs to hydropower customers, and (3) inform the design of a financial instrument to increase bug production, compensate hydropower customers for costs, and reduce conflict. A linear program identified tradeoffs between hydropower revenue and number of days of steady low releases per month for different contract and market energy prices and monthly release volumes across March to October months when bugs are most productive. We found that bug flows on 8 weekend days per summer month in 2018 from Glen Canyon Dam, Arizona reduced hydropower revenue by $300,000 (June) to $600,000 (August). Shifting bug flow days to Spring/Fall months reduced costs. To reduce conflict, we suggest to create a new financial instrument funded by the Federal Treasury for ~$300,000 to $600,000 per month. The instrument can give ecosystem managers more flexibility to choose days for steady low releases that advantage bugs and pay hydropower producers for costs. Next steps are to engage Federal agencies on benefits and limitations of the proposed instrument and expand to steady high releases that mobilize sediment, build sandbars, and disadvantage non-native, invasive fish populations.
Key Points
• Steady low releases help aquatic invertebrate production, raise costs to hydropower customers, and lower funds to maintain infrastructure. • To reduce costs, move some days of steady low releases from Summer to Spring/Fall. • Create an ecosystem fund to compensate hydropower producers for releases that help bugs, mobilize sediment, and control invasive fish.
Objectives
• Quantify tradeoffs between ecosystem (number of steady low flow days) and traditional management (monthly hydropower revenue) objectives.
• Factors influencing the shape and position of the tradeoff curve (e.g. price differential between on- and off-peak during weekdays, monthly release volume, offset releases, price type (Market and Contract), and days tempelate (Weekday-Weekday vs Saturday-Sunday-Weekday)).
• Tradeoff variation across the months and how these tradeoffs can help hydropower producers and ecosystem managers better understand how to resolve the conflict between hydropower and ecosystem objectives.
Features of the study
-
We have transformed a monthly linear hydropower objective with 744 hourly release decisions (24 hours *31 days) to a linear problem with only 6 sub-daily decisions i.e: 3 day type (Saturday, Sunday, and Weekday) and 2 periods per day.
-
The model can produce results for scenarios: monthly release volumes,on-and off-peaks energy pricing differential, offset release between off-peak weekday and weekend, and price type (market and contract).
-
Only two periodic releases per day and those releases remain constant for the month under similar flowpattern (Steady and hydropeak).
-
Concept of bugs buying water from hydropower producers by paying the losses. Tradeoffs of the months provide purchase price ($/day) of different day types during months, hence, ecosystem managers make informed purchase decisions.
-
Example of trade-off analysis used for multi-objective decision making.
-
The study is replicable and adaptable to other sites and designer flow experiments (e.g. HFEs)
Model Formulation
Details of Respository Contents
Basically there are three distinct folders: a. Months of 2018 b. Supporting Data c. Documents
a. Months of 2018: Each of the month folder has three sub-folders: Contract_Price_Model, Contract-Market_Price_Model, and Miscellaneous. There is also readme file which contains directions to run the model and reproduce results. For example: Folder " March 2018". The Contract_Price_model sub-folder has project file (.gpr), GAMS code file (.gms), and GAMS output files (e.g. .gdx, .xlxs, .lst, etc.). There are no input files because the code file has all the inputs defined. To run the model for scenarios, please update inputs in the code file. Also, it is not necessary to use the given project file (.gpr); instead you can create a new project in GAMS IDE and easily run the code file in that new project if you own a valid GAMS license. Similarly, Market-Contract_Price_Model subfolder has project file (.gpr), GAMS code file (.gms), and GAMS output files (e.g. .gdx, .xlxs, .lst, etc.) for the Market-Contract price model version. There are ample comments in the code files which are expected to help users understand and navigate easily. Finally, Miscellaneous sub-folder contains validation files, observed hydrographs, and Excel file comparing results from both model versions (Contract and Market-Contract price models).
b. Supporting Data This folder contains energy Rates used in the analysis and some gathered historical energy prices. Unfortunately, there are minimum details available related to energy prices. There are observed hydrographs from 2013 to 2021 and those excel files have some initial data analysis, visualization, and selections. Models Results Summary.xlxs file has compilation of results from model versions and scenarios. Hydropower fluctuation file has rough estimate of power variation from change in reservior storage level. Finally, there is a folder named "Weekend-Weekday" that has files from a model version with only 2 day types: Weekend-Weekday. We didn't focus this version of the model for analysis because it overshadows the importance of Saturday energy prices.
c. Documents There are documents produced during this research including proposal and final thesis/article. There are also documents about different model version we reject due to various reasons. Mainly, thesis file will be sufficient to understand the overall study.
Required Softwares
- General Algebraic Modeling System (GAMS), which can be freely downloaded from (https://www.gams.com/download/). We used GAMS 30.3 version and acquired license to run the model (https://dotclip.gams.com/Api/DownloadDistribution.aspx?token=MTE1NQ-QzEwMDA2NDE0).
If you don't posses a valid license, you can install any of the current version of GAMS and open the output files (e.g. .gdx) without running the model code (.gms files). You are not required to have a license to open output files. License for specific version of GAMS is only required to run the code files (.gms). Both code and output files are provided in the revelant folders.
- Microsoft Excel. We used Office 2016 for this analysis.
Directions to Reproduce Results
Note: Numbering of figures and tables are with reference to our under review article " Bugs Pay for Days of Steady Reservoir Releases to Reduce Costs to Hydropower Customers and Sustain Funds to Maintain Infrastructure". We will update link to that article once published. At this moment, the paper can be only accessed by email request.
First download folders name: Models and Supporting Data. Save those folder on your local machine at any desired drive location. For example: E:\GAMS\Models & E:\GAMS\Supporting Data.
Figure 2 1. Download 15 mins observed hydrograph of August 2018 from: https://waterdata.usgs.gov/usa/nwis/uv?09380000 2. Paste the downloaded data in the given Excel file. The Excel file named "Hydrographs_Observed_Used" is available in the Supporting Data folder (Supporting Data/Hydrographs_Observed_Used.xlsx). Move to the worksheet named "August_2018" and paste the downloaded release data against the time in the blue colored cells. You can visulaze the updated hydrograph in the worksheet named "August_2018 (Hydrograph)".
Table 1 1. Download folder named "Validation" available at GCD_BugFlowExperiment/Models/August 2018/Validation and save downloaded folder at your desired location. 2. You will see number of files with different extensions (e.g. .gms, .log, .lst, .lxi, .xls, .gpr). These are input and output files of two validation models: a) Hourly model (hourly releases and energy prices are model inputs) b) Saturday-Sunday-Weekday model (periodic releases and energy prices for different daytypes are model inputs). Note: Details of the hourly releases and energy prices, as well as, estimation of periodic releases and energy prices are present in excel file " Input_August2018.xlsx". 3. Now open GAMS IDE. Click start => gamside or if you have IDE icon on desktop double click that. A blank GAMS interface will show up. 4. Either you can create a new project (File/Project/New Project) or you can open the given project "Validation.gpr" in the downloaded folder. Use only one method. In case you decided to create a new project, save that new project in the same folder where other downloaded files are located. Once you will be able to create or open a project then the top most bar will tell you the location of the project you are working in. 5. Now we have to bring the code file (.gms) into our project. Click File/Open. Open Window will appear. Set Files of type: Gams files (.gms). Now if your project and files are saved in the same folder you will see two files: a) August18_Sat_Validation b) August2018_Validation(Hourly). Click one and click open. For instance, the first one we are opening is Saturday-Sunday-Weekday day model code so click August18_Sat_Validation. The code file contains all neccessary inputs and there is no need of modification or any external input file. All you have to do is run the model. There are couple of ways to run the model. A) Press F9 on your keyboard. B) Click the Run icon available in the icon bar (Hint: Point your mouse at each of the icons and it will tell you the functionality of that icon). 6. When the model will run another dialog window will appear showing status of the run. You will see "Status: Normal completion" after the run was completed. You should also check if the solution is optimal (Look for sentense saying: Optimal Solution found). You have successfully run the model and all the output files are updated. Note: We have used CPLEX Solver throughout our study (Line 158 in the .gms file). This is a linear model so it will work with any linear solver. Extra: In case to change the solver, comment out code Line 158 by placing * infornt of the line. Now Click File/Options. In the options window go to the Solvers tab and click any linear solver of your choice. Click Ok and your solver is now changed. 7. In similar manner you can run the Hourly model by opening "August2018_Validation(Hourly).gms" and run the model. This code requires external input file. So it's necessary that "Input_August2018.xlsx" should be available in the same project folder. 8. Now you can visulaze results either using GAMS platform or using MS-Excel output file (.xlsx). For instance, using GAMS IDE. Click File/Open. Change Files of type to GDX files (.gdx). Now you will see two files: a) Valid_August2018(Hourly) b) Valid_SatModel_August. Open both files one at a time. 9. To understand what different Symbol represent, please refer the details given in the code files (.gms). Here, Click Released_vol and you will find the total released volume value (Level). The energy generated is represented by symbol Xstore. For example, adding values of d1 to d31 will give total monthly energy generation from the hourly model. In case of Saturday-Sunday-Weekday model, Xstore is giving periodic energy generation of different daytypes. The monthly energy generation will be summation of energy during daytype. Monthly energy generation= 15141.4 + 26211.3+ 15141.4 + 27691.6 + 89804.7 + 235298.9 = 409289.3. 10. % Error = 100 (Model-Observed) /Observed. E.g. %Error = 100 (409289 - 392938)/392938 = 4.2%.
Figure 4 1. Go to location containig monthly models (e.g. GCD_BugFlowExperiment/Models/August 2018). Next, open "Contract Price Model" folder and then double click "Saturday_Sunday_Weekday.gpr" (Models/August 2018/Contract Price Model/Saturday_Sunday_Weekday.gpr). Please save your GAMS project at the derired location you can save it using "File/Save as" (prefferably within same directy of monthly model folder). 3.Import the code file using File/Open/August18_Sat_Sun_Weekday_Model.gms. Main window with model code will appear. You are only required to run the model (all inputs are defined in the code) and the output files will be generated/updated in the same project folder. 4. After run completion, you will see "Status: Normal completion". You should check if the solution is optimal (Look for sentense saying: Optimal Solution found). Since there are multiple scenairos in this model run so it is difficult to verify the status of each run. Alternative is to verify status of each run within ".gdx file". 5. Click File/Open. Set the Files of type: GDX files (*.gdx). Open the file "Sat-Sun-Weekday_August". Scroll to parameter "ModelResults". You will be able to see ModStat and SolStat of each run. A value of 1 means optimal solution. For further details of ModStat and SolStat visit: https://www.gams.com/mccarlGuide/modelstat_tmodstat.htm 6. After verifying the optimality of the runs, the results can be visualized using provided Excel file "Graphs.xlsx" (Models/August 2018/Contract Price Model/Graphs.xlsx). 7. Move to the worksheet "Tradeoff_Graph". You are required to update the values in the blue highligted cells. Those values can be found in the .gdx file or the output .xlsx file. Open "Sat-Sun-Weekday_August.xlsx" located in the project folder. Move to the worksheet "Fstore". You will see four populated columns (A-D). Figure 4 is for Zero offset (H1). So select only H1 in Offset column using the drop down. 8. Copy the Values from column D (Value) and paste those copied numbers in Tradeoff_Graph worksheet within the Graphs.xlsx. The trade-off graph in the Graph_Tradeoff worksheet will be updated.
Figure 5 1. Within same Excel file "Graph.xlsx" you will see a worksheet named "Hydrograph_H0". This worksheet has hydrographs for different number of steady low flow days scenarios with 0.83 MAF (V2) release volume and zero offset release (H1). 2. You are only required to replace the values in the blue highlighted cells. Those values are releases that can be found in "Sat-Sun-Weekday_August.xlsx" under parameter RStore. You have to set Offset column to H1 and tot_vol to V2. 3. Copy releases from the Value column and paste those in Hydrograph_H0 worksheet within the Graphs.xlsx. The hydrograph on the right will be updated. Extra: Worksheet Hydrograph_H1000 is provided as example of Hydrographs with 1000 CFS offset release.
Figure 6 1. We need results from both Contract Price and Market-Contract Price models. You have already acquired Contract Price (Saturday-Sunday-Weekday) Model results in Figure 4 above. You are required to run Market-Contract Price model whose code is available within folder: GCD_BugFlowExperiment/Models/August 2018/Market-Contract Price Model/August18_Market pricing.gms. 2. You are required to run the model code similar to previous figures. After successful completion of the run, the output files will be updated. 3. Go to: GCD_BugFlowExperiment/Models/August 2018/Miscellaneous/Contract_vs_Market-Contract Results.xlsx. You are required to update values of the blue highlighted cells. For Saturday-Sunday-Weekday model, use values of Fstore parameter from Sat-Sun-Weekday_August.gdx or from Sat-Sun-Weekday_August.xlsx (Location:GCD_BugFlowExperiment\Models\August 2018\Contract Price Model). The results of the Market-Contract price model can be found from Fstore within Pricing_Model.gdx or Pricing_Model.gdx (Location: GCD_BugFlowExperiment\Models\August 2018\Market-Contract Price Model). 5. Updated values will automatically update the tradeoff graph in the worksheet. Note: Additional calculations in the worksheet are for later stages.
Table 2 This table compiles hydropower revenue results of months of 2018. Here, you are required to use monthly models available in the Models folder (Location: GCD_BugFlowExperiment\Models). 1. You are required to run model for each of the months seperately and gather results in Excel file named "Models Results Summary" (location: GCD_BugFlowExperiment\Supporting Data\Models Results Summary.xlsx) and worksheet "Market Price_Summary". 2. As an example, we are only mentioning process to reproduce results for March 2018. You are required to replicate the same procedure for other months inorder to reproduce Table 2. 3. Move to March 2018 folder within Models folder. Enter into Market-Contract Price Model folder and get the March18_Market Pricing.gms. Follow the same procedure i.e. either import the Code (.gms) file within the available project "Market_Price.gpr" or create a new project in GAMS IDE. 4. Code file has all the required inputs and you are only expected to run the model by pressing F9 or Run button. Successfull run will update the output files (e.g. .gdx, .xlsx, etc.) within project folder. 5. Open Pricing_Model excel sheet (Location: GCD_BugFlowExperiment\Models\March 2018\Market-Contract Price Model\Pricing_Model.xlsx) and move to FStore Worksheet. 6. Table 2 is for H4 (i.e. 1000 CFS offset release) and V2 (0.83 MAF) release volume. Set H4 in column A, V1 and V2 in Column B. Copy values of V1 and V2 and paste those in "Models Results Summary.xlsx" (location: GCD_BugFlowExperiment\Supporting Data\Models Results Summary.xlsx ) and Market Price_Summary worksheet. You will see blue highlighted cells. Paste the copied values in the highlighted cells. Be careful with placing the values on their respective positions. 7. Values of Table 2 are given in green highlighted cells. 8. Repeat same procedure for Months of 2018.
===============================================================================================
Supplementary
Figure S2 , S3, S4 1. Download hydrographs at: https://waterdata.usgs.gov/usa/nwis/uv?09380000
Figure S5
Figure S6
Figure S7
1. Import the August18_PriceDiff.gms file into GAMS IDE (same procedure as defined in Figure 4). Now within the code you have to set different energy prices i.e. only active one pricing set for "Energy_Rate" parameter and save its results. In the code move down to line: 94 "Energy_Rate(Days,p)". You will see three energy price sets (Current, Half, and Zero). Your task is to active only pricing set by placing *infront of $ontext and $offtext. When the set will be actived then you will see the prices turned into green from gray color. The next is to scroll down at the bottom of the code where it says "following part of code creates gdx and excel output file..". You have to only active the chunk of code depending on which pricing set you have activated above. Run the model for each set of pricing (Current, Half, and Zero) seperately.
2. Open .gdx files for each of the runs: "Sat-Sun-Weekday_Current.gdx", "Sat-Sun-Weekday_Half.gdx", and "Sat-Sun-Weekday_Zero.gdx".
3. Open Graphs.xlsx and move to "Price_Differential" worksheet. Your job is you copy the hydropower power revenue values from .gdx file (go to "Fstore" symbol and copy the values). Within Fstore you can move the dimensions around e.g. bring cases to the vertical axis and Volume (V) and Offset (H) to the horizontal axis. Copy the values for H1 and paste those in the blue highlighted cells in Price_Differential worksheet against respected pricing set.
4. The graph at the bottom will be updated. Note: Don't confuse with any of the additional calculations in the worksheet. Those are additional computations which can be useful at later stages.
Figure S8
Table S2 This is extention of Table 1 and follow the similar produce for different months. You can use excel file named " Model Results Summary" and worksheet named "Validation_Results" to compile results from monthly models.
Table S3
Table S4 1. Use file: GCD_BugFlowExperiment/Supporting Data/Hydropower_Fluctuations (2018).xlsx. 2. We used data from USBR website (https://www.usbr.gov/uc/water/crsp/cs/gcd.html) for elevation and average monthly cfs (discharge), and back calculated the head. 3. We made some coarse assumptions regarding dam efficiency (discussed in the excel file).
Working version of the repository
https://github.com/moazzamalirind/GCD_BugFlowExperiment
Requested Citation
Moazzam Ali Rind and David E. Rosenberg (2022). "Bugs Pay for Days of Steady Reservoir Releases to Reduce Costs to Hydropower Customers and Sustain Funds to Maintain Infrastructure". Hydroshare.org. https://doi.org/10.4211/hs.b5c65e50679f48dfaf0d5e86dafd9815.
Credits
Funding Agencies
This resource was created using funding from the following sources:
Agency Name | Award Title | Award Number |
---|---|---|
Pakistan Ministry of Higher Education |
How to Cite
This resource is shared under the Creative Commons Attribution CC BY.
http://creativecommons.org/licenses/by/4.0/
Comments
There are currently no comments
New Comment