Checking for non-preferred file/folder path names (may take a long time depending on the number of files/folders) ...

Bloede Dam Removal Imagery of Patapsco River, part 1


Authors:
Owners: This resource does not have an owner who is an active HydroShare user. Contact CUAHSI (help@cuahsi.org) to determine if accessing this resource is possible.
Type: Resource
Storage: The size of this resource is 18.2 GB
Created: May 29, 2026 at 7:56 p.m. (UTC)
Last updated: Jul 02, 2026 at 9:02 p.m. (UTC)
Citation: See how to cite this resource
Sharing Status: Discoverable (Accessible via direct link sharing)
Views: 99
Downloads: 24
+1 Votes: Be the first one to 
 this.
Comments: No comments (yet)

Abstract

In 2018 the Bloede Dam was removed from the Patapsco River near Ilchester, Maryland, USA. Located within Patapsco State Park, the 30ft Bloede Dam was the first hydroelectric dam in the U.S. and the generator was enclosed within its superstructure. However, it had been defunct for nearly a century at the time of its removal and was a considered a safety hazard for swimmers and for the nearby county sanitary sewer main, as well as a barrier to fish passage. As part of the dam removal effort, a study of the channel morphology was initiated by NOAA Fisheries and American Rivers before and after dam removal. Surveyed cross sections were located by Maryland Geological Survey at selected points along the channel upstream, downstream, and within the dam pond itself. To complement the surveyed cross sections, aerial photographs were collected using off-the-shelf aerial drones. The imagery was collected over a similar river length encompassing the Bloede pond prior to, during, and after removal was completed. Structure-from-motion photogrammetry was used to develop point clouds and topo-bathymetric digital elevation models to document channel change between just upstream of the dam pond and about a quarter mile downstream of the dam. This data release includes the imagery from that collection effort used to document sediment evacuation from the dampond. This archive was referenced in the paper by Collins, M.J., Baker, M.E., Cashman, M.J., Miller, A. and Van Ryswick, S., 2024. Impounded sediment and dam removal: Erosion rates and proximal downstream fate. Earth Surface Processes and Landforms, 49(9), pp.2690-2703.

Subject Keywords

Coverage

Spatial

Coordinate System/Geographic Projection:
WGS 84 EPSG:4326
Coordinate Units:
Decimal degrees
Place/Area Name:
Bloede Dampond, Ilchester, Maryland, USA
North Latitude
39.2519°
East Longitude
-76.7561°
South Latitude
39.2440°
West Longitude
-76.7663°

Temporal

Start Date:
End Date:

Content

Related Resources

This resource belongs to the following collections:
Title Owners Sharing Status My Permission
Bloede Dam Removal Imagery of the Patapsco River at Ilchester, Maryland, USA Matthew Baker  Private &  Shareable None

Credits

Funding Agencies

This resource was created using funding from the following sources:
Agency Name Award Title Award Number
NOAA National Marine Fisheries Service Northeast Fisheries Science Center Coastal and Marine Habitat Restoration Award NA13NMF4630127, NA16NMF4630317 and NA19NMF4630270
American Rivers Aerial Monitoring of the Bloede Dam Removal CE18NOA248

Contributors

People or Organizations that contributed technically, materially, financially, or provided general support for the creation of the resource's content but are not considered authors.

Name Organization Address Phone Author Identifiers
Jack Hardway Elevated Media Concepts MD, US

How to Cite

Baker, M. (2026). Bloede Dam Removal Imagery of Patapsco River, part 1, HydroShare, http://www.hydroshare.org/resource/c19b2ae6b62541a9bbe12c79b420fa1e

This resource is shared under the Creative Commons Attribution CC BY.

http://creativecommons.org/licenses/by/4.0/
CC-BY

Comments

There are currently no comments

New Comment

required